Abstract: 

The aim of this article is to study how selected variables influence delays in train traffic. Data has been collected on train movements, timetables, weather and capacity utilization on a highly utilized single-track railway line in southern Sweden during 2014. Based on this dataset, we have analysed how different factors affect delays in passenger traffic. We measure delays in a novel way, as deviations from the scheduled duration for each line section and station stop, not as deviations from a published or operational timetable, and this allows us to identify when and where the delays first occur. Average delays were much larger at station stops. The most significant factor affecting delays was the scheduled duration time at station stops and the existence of margins on line sections. If trains arrive to a line section or station stop slightly delayed they speed up the activity, otherwise they are typically delayed. The influence of weather was less significant and somewhat contradictory: snow and cold temperatures increase delays on line sections but reduce them at station stops, while precipitation made no difference. Capacity utilization seems to have a negative correlation with delays, but we have too little variation in the levels to be confident. All studied variables, except for precipitation, have impacts that are statistically significant to a very high degree of confidence, using both t-tests and regression analysis. The results of this study have important practical implications for timetable construction; for instance we estimate that a reallocation of scheduled time at stations could reduce delays by as much as 80%.

Keywords: 

allowances, delays, margins, punctuality, railroad, railway, station stop, timetable, trains, travel time variation

  References

[1] Nyström, B., Aspects of Improving Punctuality, Luleå University of Technology DoctoralThesis, 2008.

[2] Olsson, N.O.E. & Haugland, H., Influencing factors on train punctuality – results fromsome Norwegian studies. Transport Policy, 11(4), pp. 387–397, 2004.

[3] Harris, N.G., Planning Passenger Railways: A Handbook. A & N Harris, London, 1992.

[4] Goverde, R.M.P. Punctuality of Railway Operations and Timetable Stability Analysis.The Netherlands TRAIL Research School Thesis Series no. T2005/10, 2005.

[5] International Union of Railways, UIC Code 451 Timetable recovery margins to guaranteetimekeeping – Recovery margins, 2000.

[6] Pachl, J., Railway Operation and Control. VTD Rail Publishing: Mountlake Terrace,2002.

[7] Palmqvist, C.W., Running Time Supplements for High Speed Trains. Lund UniversityMaster Thesis 257, Lund, 2014.

[8] Vromans, M.J.C.M., Reliability of Railway Systems. ERIM PhD series Research inManagement 62, 2005.

[9] Kroon, L., Dekker, R. & Vromans, M., Cyclic railway timetabling: A stochastic optimizationapproach. Algorithmic Methods for Railway Optimization, 16, pp. 41–66, 2007.DOI: 10.1007/978-3-540-74247-0_2

[10] Parbo, J., Nielsen, O.A. & Prato, C.G., Passenger perspectives in railway timetabling:A literature review. Transport Reviews, pp. 1–27, 2015.

[11] Ceder, A. & Hassold, S., Applied analysis for improving rail-network operations. Journalof Rail Transport Planning & Management, 5, pp. 50–63, 2015.

[12] Bender, M., Büttner, S. & Krumke, S.O., Online delay management on a single trainline: beyond competitive analysis. Public Transport, 5, pp. 243–266, 2013. DOI:10.1007/s12469-013-0070-z

[13] Harris, N.G., Mjøsund, C.S. & Haugland, H., Improving railway performance in Norway.Journal of Rail Transport Planning & Management, 3(4), pp. 172–180, 2013.

[14] Xia, Y., Van Ommeren, J.N., Rietveld, P. & Verhagen, W., Railway infrastructure disturbancesand train operator performance: The role of weather. Transportation ResearchPart D, 18, pp. 97–102, 2013. DOI:10.1016/j.trd.2012.09.008.

[15] Wei, D., Liu, H. & Qin, Y., Modeling cascade dynamics of railway networks underinclement weather. Transportation Research Part E, 80, pp. 95–122, 2015.

[16] Ludvigsen, J. & Klæboe, R., Extreme weather impacts on freight railways in Europe.Natural Hazards, 70, pp. 707–787, 2014.

[17] International Union of Railways, Winter and Railways, UIC/SIAFI Report, 2011.

[18] International Union of Railways, UIC CODE 406 Capacity, 2004.

[19] International Union of Railways, UIC CODE 406 Capacity, 2013.

[20] Markovic, N., Milinkovic, S., Tikhonov, K.S. & Schonfeld, P., Analyzing passengertrain arrival delays with support vector regression. Transportation Research Part C, 56,pp. 251–262, 2015.

[21] Gorman, M.F., Statistical estimation of railroad congestion delay. Transportation ResearchPart E, 45, pp. 446–456, 2009.

[22] Wallander, J. & Mäkitalo, M., Data mining in rail transport delay chain analysis. InternationalJournal of Shipping and Transport Logistics, 4(3), pp. 269–285, 2012.

[23] Rietveld, P., Bruinsma, F. R. & van Vuuren D.J., Coping with unreliability in publictransportation chains: A case study for Netherlands. Transportation Research Part A,35, pp. 539–559, 2001.

[24] Noland, R. B. & Polak, J. W., Travel time variability: a review of theoretical and empiricalissues. Transport Reviews, 22(1), pp. 39–45, 2002.

[25] Nicholson, G., Kirkwood, D., Roberts, C. & Schmid, F., Benchmarking and evaluationof railway operations performance. Journal of Rail Transport Planning & Management,5(4), pp. 274–293, 2015. DOI: doi:10.1016/j.jrtpm.2015.11.004